A 4 MW data hall, energized on time.

Project
Colocation data hall power and cabling
Client
Confidential colocation operator
Location
Southeast US
Value
Confidential
Period
To confirm
Status
Completed
Cabling crew in hard hats and hi-vis working along a row of racks in a data hall aisle

The brief

Power and cabling for a 4 MW colocation data hall, delivered as one package: medium-voltage feeders, busway and PDUs, grounding, racks and structured cabling, then testing and commissioning to the operator's acceptance file.

Program stages3 stages
  1. Power to the rack row

    Medium-voltage feeders, busway and PDUs to every rack row, with grounding and bonding throughout.

  2. Racks and cabling

    Racks and containment installed to the drawing; fiber and copper cabling labeled and certified.

  3. Testing and commissioning

    Load bank, thermal and integrated systems tests, closed out in the operator's acceptance file.

Challenges

What made it hard, and what we did about it.

A fixed energization date
Feeders, busway and racks sequenced so testing could start on the agreed date.
A live campus around the hall
Work held inside the operator's change windows, with every shutdown planned and logged.
Results

Results, as approved by the client.

data hall energized
4 MW
energization date held
On time
recordable incidents
Zero
acceptance file delivered
Complete